CONEX PAINTING Q-A 2 (OL-A RESPONSES--R1).PDF
Published: 06/11/2026
Description
Q&A #2 Conex Corrosion Control, Bldg 417 Please confirm whether the existing labels, decals, and stickers on the container shall be protected and maintained, or if they may be removed and replaced during painting operations. Answer: Per...
