N0018913TPP01_ATTACHMENT_1_PERFORMANCE_WORK_STATEMENT
Published: 06/07/2013
Description
PERFORMANCE WORK STATEMENT FOR MOVING PIPE, TUBE, AND BAR STOCK FROM THE STEEL SHED (BLDG. 177) TO BLDG. 170 1. BACKGROUND. Currently all Nuclear and Non-Nuclear cognizant pipe, tube, and bar stock is stored in the Steel Shed (Building(Bldg) 177). Th...
