SOO MVT TFS.PDF
Published: 08/18/2026
Description
Statement of Objectives Requirement Meet Y/N? 1. Provide tension fabric structure or rigid wall shelter with minimum dimensions of 43’x62’ and an 18’x18’ electrical powered roll up door, ventilators, watertight ground connection, and v...
