ATTACHMENT_1-SCOPE_OF_WORK.PDF
Published: 08/18/2026
Description
Firestation Concrete Slab Replacement Scope of Work 1. Introduction This Scope of Work (SOW) outlines the requirements and responsibilities for replacing the existing concrete pad at the firestation with a new 4000 psi concrete slab measurin...
