RFIS MOF RESTROOMS 18_AUG_26.PDF
Published: 08/18/2026
Description
Question Answer Can a layout/blueprint be provided for the entire building? attached Does the ANG want the old doorway patched and painted back with CMU or Drywall and framing? if this is referring to the doorway into the conference room, then clos...
