B08-W912PF26RA011_ATT07_PPI LOG_20260819.PDF
Published: 08/19/2026
Description
1 15-Jun-26 PreSol What phase is the above project in? Has design already occurred? This is a design-bid-build (DBB) project. The design is attached to the solicitation for the construction project - 2 15-Jun-26 PreSol Is this a stand-alone contra...
