CGC POLAR STAR FOP REPAIR.PDF
Published: 09/08/2026
Description
Scope of Work USCGC POLAR STAR (WAGB-10) Troubleshooting and Repair of OWS Flow Totalizer 1. Purpose The contractor shall provide all labor, supervision, tools, test equipment, incidental materials, travel, and technical support necessary to t...
