VA701-13-B-0192 A00005 CHEYENNE B-WING AHU UPGRADE IFB AMEND A00005
Published: 07/17/2013
Description
CONTINUATION PAGE 8. DESCRIPTION OF AMENDMENT (Continued): The purpose of this amendment is to perform the following: Add Specification Section 23 21 13 – Hydronic Piping to the Project Specifications. This Specification Section shall be considered...
