SOW_REVISION1
Published: 08/20/2013
Description
SCOPE OF WORK 1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials and equipment as required to remove existing under floor power junction/distribution boxes, existing power cables and Electrical Metallic Tubing (EMT) and inst...
