VA248-13-R-2295 S02 SECT 01 32 16 17 PROJECT SCHEDULES 516-13-605 RENO STAT DOM WAT SYS (8-15-13)
Published: 08/20/2013
Description
SECTION 01 32 16.17 Project SCHEDULES 516-13-605 Renovate Station Domestic Water System (Small Projects – Design/Build) PART 1- GENERAL 1.1 DESCRIPTION: A. The Contractor shall develop a Critical Path Method (CPM) plan and schedule demonstrating fu...
