2013_RFQ0030_VISTA_IMAGING
Published: 08/20/2013
Description
Scope of Work Contractor shall replace current VistA Imaging Long Term storage solution – Write Once Read Many (WORM) based platform with a storage grid configuration. The new configuration shall replace a platter based solution, while leveraging t...
