VA243-13-B-1215 A00001 VA243-13-B-1215 A00001
Published: 08/20/2013
Description
Continuation Page: Pre-Bid RFI Questions: Per plumbing demo note on contract document PD-101, "requires a contractor be responsible to disconnect and remove all existing sanitary waste air piping vent cold and hot water piping fixtures etc. no longer...