ATTACH_4_-_STEC_14_CPFF_LABOR_RATES_-_FINAL_-_SB
Published: 08/27/2013
Description
SECTION J – ATTACHMENT 4 COST-PLUS-FIXED-FEE (CFFP) COST TABLES (SAMPLES) FOR STEC14 SPACE TEST AND ENGINEERING CONTRACT 2014 (STEC14) SAMPLE COST-PLUS-FIXED-FEE (CPFF) COSTING TABLES FULLY-BURDENED LABOR RATES Table L.6.5.a. instructions are found...
