ATTACHMENT_12_ETP_LORTON_SOW
Published: 11/18/2013
Description
Statement of Work Integrated Logistics Support (ILS) ETP Lorton Support Line Item 1 September 19, 2013 HSBP1012R0071 Attachment 12 1. BACKGROUND -- As stated in Section 1 of the IDIQ SOW 2. SCOPE The Contractor shall provide ETP Lorton Integrated Log...
