P45E60_SMILAX_SOW
Published: 04/01/2014
Description
31102_MWC_0214_100WLIC Ship Service Diesel Generator Engine(s), Overhaul (Contractor’s Facility) 1. SCOPE 1.1 Intent. This work item describes the requirements for the Contractor to remove, overhaul at the Contractor’s facility, reinstall and tes...
