FACILITY_SPECIFICATIONS
Published: 04/02/2014
Description
Construct Vehicle Maintenance Facility Ruby Creek Fairchild AFB, WA Facility Specifications: 1. PEB – per the attached drawing Color: based on CoolR swatch Roof – Mansard Brown Siding & Trim – Sandstone Design Specifications: Wind – 100 MPH, ...
