ATTACHMENT_1_-APPENDIX__D_PROJECTED_DEPOT_WORKLOAD
Published: 04/24/2014
Description
APPENDIX – D Projected Depot Workload 1. KC-10 depot inductions are driven by the following: KC-10 Depot Workload a. C-Check – Once Every 108 Weeks b. Modifications / TCTOs – As Required c. Unscheduled Depot Maintenance (Drop-Ins) – As Requir...
