WORKLIST
Published: 04/24/2014
Description
Road # Milepost Description of Work 2024100 0.32 BOP 2024100 0.32 Temporary crossing 0.34 Remove 90' Hamilton modular steel bridge and transport to Rowan Bay on Kiui Island. Excavate fill slopes at 1V:3H beginning at the top of the sills. Fish June 1...
