ENCLOSURE_1_-_EQUIPMENT_SPECIFICATIONS-1
Published: 04/24/2014
Description
Enclosure 1- Revision 1 Equipment Specification Requirements The following is for a complete, new, installed and operating AFM/CFM system and associated ancillary equipment to be installed at the Ames Laboratory. Hardware Requirements 1. System shoul...
