SITE_VISIT_Q_&_A_13_MAY_2014
Published: 05/16/2014
Description
Questions Site Visit 13 May 2014 Fire Suppression Discrepancies Hanscom AFB Are stamped drawings required for the entire area? For the stamped drawings the contractor needs to just do the areas where they changed the locations. They don't have to do ...
