N6883614T0208_DRAFT_STATEMENTOF_WORK_(SOW)
Published: 06/30/2014
Description
STATEMENT OF WORK MODULAR FLOATING WORK PLATFORMS 1.0 INTRODUCTION The Trident Refit Facility, Kings Bay, Georgia, has a NEED to obtain a modular floating work platform system. 2.0 SCOPE This Statement of Work (SOW) sets forth the minimum requirement...
