VA528-14-Q-0313 A00003 VA528-14-Q-0313 A00003
Published: 06/30/2014
Description
CONTINUATION PAGE Questions received and answers. 1. Question: Referencing complete site drawings. SW1, drawing 2 of 5, note number 5 signifies the shaded symbol to represent "new sidewalks to be installed by contractor IAW these documents..." Howeve...
