SPECIFICATION_01010,_SUMMARY_OF_WORK
Published: 07/01/2014
Description
SECTION 01010 SUMMARY of work PART 1 - GENERAL summary This project is located at the Priest Lake Ranger Station and shall consist of the following: - Remove the existing membrane roofing system down to the original asphalt roof (including insulation...
