VA101-14-R-0113 A00002 SPEC SECTION 01 00 00 REVISION 8-11-14
Published: 08/11/2014
Description
AMENDMENT #2 8-11-14 ADD THE FOLLOWING PARAGRAPHS TO THIS SECTION SECTION 01 00 00 GENERAL REQUIREMENTS 1.29 TEMPORARY CEMETERY DIRECTOR FIELD OFFICE SEE ATTACHED “SKETCH TEMP CEM DIR TRAILER 8-11-14� A. The Contractor shall, within thirty (30) d...
