BULLIS--SOW_B-6107_AV_EQ_09.15.2014
Published: 09/15/2014
Description
Statement of Work Building 6107 Classrooms AV Digital Conversion Camp Bullis, Texas Revised 15 September 2014 1.1 DESCRIPTION OF SERVICES/GENERAL INFORMATION. The contractor shall design, engineer, install, test, train, and maintain during the warran...
