SEC_J_ATCH_2M_FUEL_BODY_TANK_TASK_LIST_11_SEP_2014
Published: 09/15/2014
Description
FA8621-14-R-6323 DRAFT Section J, Attachment 2M Fuel Body Tanks Trainer Task List Reference Enabling Objective Using tech data and support equipment, install body tank 1 one shutoff valve refuel assembly, with no instructor assist Using tech data and...
