NEWSOW
Published: 09/17/2014
Description
Scope of Work Chicago Lock Electrical Support for New Winches 16 September 2014 GENERAL The contractor is required to provide electrical upgrades in support of two winches already in USACE possession. Electrical work is as shown on sheet E-101. SUBMI...
