SITE_VISIT_MEMORANDUM-_17_SEPT_2014
Published: 09/17/2014
Description
Site Visit Memorandum -The requirement is for two Vertical Lift Modules -A backup generator, or back capabilities are required due to 24/7 operations. -Maintenance Squadron (MXS) will have current machines demoed, removed and space ready for installa...
