AMENDMENT #2
Published: 12/22/2014
Description
VA69D-15-B-0080-A00002001.docx RFI’s Note: · We shall not require a Bid Form for the deductives, as the FHCC intention is to award the project as a whole without reducing the scope. The contractor shall include everything shown on the drawings and ...