VA261-15-B-0160 TS02 DIALYSIS SPECS 640.15.136 V2.0
Published: 12/24/2014
Description
VAMC Palo Alto, CA SECTION 01 00 00 GENERAL REQUIREMENTS 1.1 GENERAL INTENTION A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and mater...
