SOW_WCF_HORIZONTAL_LIFTDOCK_LEVELER_REPLACEMENT_-_DRAFT_FOR_POSTING
Published: 12/24/2014
Description
BUREAU OF ENGRAVING AND PRINTING WESTERN CURRENCY FACILITY STATEMENT OF WORK FOR CONSTRUCTION SERVICES WCF Horizontal Lift/Dock Leveler Replacement October 6, 2014 1.0 Background 1.1 The BEP requires the procurement and installation of two (2), Serco...
