ATTACHMENT_J__15_WI_021_PRICING
Published: 01/30/2015
Description
Sheet1 Cargo Tanks PRIME Contractor SUB Contractor Other Costs TOTAL PRICE Description Tank Location 100% Capacity Area PRIME L/H LABOR PRICE MATERIAL PRICE SUB L/H LABOR PRICE MATERIAL PRICE TOTAL L/H TOTAL LABOR PRICE TOTAL MATERIAL PRICE (gals) (s...
