LD2_BOILER_SCOPE_AMENDMENT_1
Published: 02/19/2015
Description
Scope of Work Boiler Replacement and Controls Upgrade at USACE Lock 2 Central Control Station Hastings, Minnesota Amendment #1 1. Space Temperature Thermostat Replacement The space temperature thermostats for Air Handling Units #1 and #2 shall be rep...
