F20GUIDE
Published: 02/20/2015
Description
FREQUENCY: Semiannual Special Instructions: 1. This work should be scheduled immediately prior to the scheduled maintenance on dry pipe valves or alarm check valves (wet pipe). Needed replacement of sprinkler heads should be performed at that time. C...
