DENISON_DAM_SOURCES_SOUGHT_ATT
Published: 04/14/2015
Description
APPENDIX 1: Purpose and Objectives SUMMARY OF WORK 08/11 PART 1 GENERAL 1.1 GENERAL PROJECT DESCRIPTION This project will be a total turn-key, Design-Build (D-B) contract with all design and construction work being performed by the Contractor. The ...