VA259-15-B-0207 A00004 NEW BID SCHEDULE
Published: 04/14/2015
Description
Base Bid: Contractor shall provide all equipment, material and labor necessary to correct specific building mechanical equipment and control deficiencies identified in a recent retro-commission (RCx) study. Included are variable air volume (VAV) box ...
