5-2015_A-E_SELECTION_-_APX_1_-_DESIGN_CONSIDERATIONS
Published: 04/16/2015
Description
Appendix 1 Dyess AFB, Texas DESIGN CONSIDERATIONS 2015 A/E PART 1 – GENERAL (The following special design considerations will be included in and made a part of all Dyess A-E statements (scopes) of work/contracts for A-E firms doing design on or for...
