DENVER_SURVEILLANCE_Q&A
Published: 04/17/2015
Description
Question The project specifications do not define the acceptable method for cable pathway/raceway. Please confirm that free-air installation of wiring above the drop ceiling, in conjunction with plenum-rated cable, is acceptable. The drawing and spec...
