IFB # 24497 HARDWARE, TRANSMISSION LINE, VARIOUS SHACKLES, LOS ANGELES, CA
Published: 08/03/2015
Description
GENERAL CONDITIONS 1. General Requirements: The Contractor shall furnish and deliver conductor hardware in accordance with this specification and attached drawings: 2. Delivery: Delivery is required as follows: a. Ninety (90) calendar days after the ...
