ATTACHMENT_11_-_FINAL_TECHNICAL_BRIEFING_CONTENT.DOCX
Published: 08/03/2015
Description
ATTACHMENT 11 Final Technical Briefing The Contractor shall provide a final technical briefing at the end of the POP. The briefing shall be conducted at a location to be specified by the Government. This briefing shall include the following informati...
