PACKAGE.ZIP
Published: 08/04/2015
Description
RFI_-8.docx FTFA 03-1231 REPLACE HVAC BUILDING 129 REQUEST FOR INFORMATION (RFI)-8 Q1: Has an asbestos survey been done for the building? The age of the HVAC equipment, pipe insulation etc… have us concerned and do not see this potential hazar...
