ITB # STP 2016(174) ACP, LVL-UP, FULL DEPTH REPAIR AND SC, TEXAS
Published: 08/27/2015
Description
COUNTY: CALDWELL, ETC HIGHWAY: FM 1322, ETC LENGTH: 31.5970 MI CONTROL NUMBER: 1375-01-010, ETC DBE GOAL: 0.0 % PROJECT NUMBER: STP 2016(174) TYPE: ACP, LVL-UP, FULL DEPTH REPAIR & SC TIME FOR COMPLETION: 56 WORKING DAYS GUARANTY: 64,000.00 BIDS RECE...
