VA250-15-B-0348 A00001 FINAL CONSTRUCTION DRAWINGS PART II 02.PDF
Published: 08/28/2015
Description
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. 19. CONTRACTOR SHALL COORDINATE DEMOLITION WITH OWNER; SALVAGE AND TURN OVER TO OWNER DOORS, HARDWARE, TOILET ACCESSORIES, CURTAIN TRACKS, LIGHT FIXTURES AND OTHER ITE...
