VA250-15-B-0348 VA250-15-B-0348_1.DOCX
Published: 08/28/2015
Description
NOTE: DUE TO THE SIZE OF THE DRAWINGS – DRAWINGS WILL BE POSTED IN AN AMENDMENT. STATEMENT OF BID ITEMS: NOTE: The VA requires the contractor prior to any mobilization at the site to complete the below listed requirements. The contractor is allowed...
