CS_8_ITEMS_OF_WORK_-_REVISED_8-28-15.PDF
Published: 08/30/2015
Description
4. ITEMS OF WORK AND CONSTRUCTION DETAILS Items of work to be performed in conformance with this specification and the construction details are: Bid Item 1, Mobilization and Demobilization (1) This item shall consist of the mobilization and demobiliz...
