PWS_CHANGES_TREE_REMOVAL_AND_PLANTING.DOCX
Published: 08/31/2015
Description
PWS Changes: Para 1.1 – Total amount of trees to be planted changed from 85 to 137 Para 1.2.1 (e – g) – Clarified tree removal near concrete sections Para 1.2.2 – Location of plants shall be proposed by contractor that is awarded contract for...
