VA259-15-R-0569 VA259-15-R-0569.DOCX
Published: 10/05/2015
Description
A.1 STATEMENT OF WORK Overview This project is to replace one (1) 150 HP steam boiler with two (2) 3,000 MBTU high efficiency hot water generators. The project also includes extending the hot water piping infrastructure from the crawlspace up into th...
