ITB # 6283-58-001 FULL WIDTH MOWING (TRACT 8-BOWIE), TEXAS
Published: 10/14/2015
Description
NOTICE TO CONTRACTORS PROPOSALS ARE REQUIRED ON THIS PROJECT COUNTY: BOWIE HIGHWAY: US0259 LENGTH: 0.0010 MI CONTROL NUMBER: 6283-58-001 SBE GOAL: 0.0 % PROJECT NUMBER: RMC - 628358001 TYPE: FULL WIDTH MOWING (TRACT 8-BOWIE) TIME FOR COMPLETION: 40 W...
