PAINT_BOOTH_2-DS-A.PDF
Published: 10/29/2015
Description
BREATHING AIR 2" "L" COPPER 22 FEET UP, PIPE RUNS END TO END OF BUILDING CONCRETE FLOOR COMPRESSED AIR 2" PIPE 15 FEET UP. PIPE RUNS END TO END OF BUILDING ELECTRICAL CONTROL PANEL OPERATION CONTROL 18W X 12H X 12D WORKING DIM OPEN FACE PAINT BOOTH S...
