0501_A_CMWD_PIPE_REPLACEMENT_(ZONE_1)_REVISED.DOC
Published: 01/07/2016
Description
ABSTRACT: This work item describes the requirements for the Contractor to replace the Counter Measure Wash Down “Cross-Tie� Piping leading to deck nozzles in Zone 1 as well as install low point drains in RAZ Bays 1 thru 4. REFERENCES/ENCLOSURE: R...
